That slab is up!
In early October, it seemed to us that our timber floor slab was almost finished: the joists were in place, as were the famous bracing ties… just one or two struts, a few OSB boards, and we’d be done! we thought to ourselves. Meanwhile, Saint Splinter (whom you know) was choking with laughter.
So it seemed to us that by stepping up the pace a little, we might, with a bit of luck, quickly move on to building the trusses for our roof structure, the subframes for our doors and windows, and the bottom plate, and get our straw walls up before winter. To help us pick up the pace, we called in a pro: our friend Rémi, a man with his heart on his sleeve and a carpenter by trade, specialising in green building. Throughout October, he provided us with simply outstanding support. With him came a crack team: Marien, Louise, the incomparable Amin (aka SuperMec ;), as well as Adrien, Amrita and Guillaume (from the Twiza network), together with a furry energy ball named Freya, and Tao, a Chinese photographer and filmmaker who now lives in Spain (author of the best photos on this page!).
And finally, yesterday, 30 October… we managed to get this slab sorted at last! Because, as usual, we had seriously underestimated the enormous amount of work that still needed doing. In fact, as well as finalising the slab’s structure (finishing all the drilling and bolting, joisting the terrace, fitting the struts…), simply laying the OSB boards on top of and underneath the joists – to form boxes – involves a whole host of tasks: fitting reinforcements, screwing and nailing while crawling forever beneath the slab, but also the time-consuming and meticulous application of large quantities of special adhesive tape to all the joints to ensure the air and water tightness of these boxes (to prevent, amongst other things, any intrusion by rodents and other unwelcome guests). And above all, cutting the bottom panels to size with a jigsaw so that they fit as closely as possible to the irregular shapes of our acacia stakes and the ties. In short, a few rather painstaking and time-consuming tasks.
But it’s done, and done well! And we were able to finish by blowing the insulation – cellulose wadding – into the cavities formed by the OSB and the joists, using a blowing machine. Once we’d got the hang of the temperamental gadget, everything went like clockwork. Finally, we unrolled a waterproof membrane over the surface of the OSB, which will act as a barrier between the screed and the terracotta tiles that will cover the ground floor. We can now walk around our future floor, and get a proper sense of the volume of the house!
Meanwhile, another task kept us busy for a few days: erecting scaffolding. The idea was to set up, on either side of the slab, the famous umbrella scaffold that we had acquired earlier this year during an epic trip through the flooded countryside of France, so that we could work on our slab without getting wet. Unfortunately, we eventually had to abandon the idea. After extensive research and consultation with an expert in the field, we realised – a trifle too late – that our ‘turret’ scaffolding wasn’t compatible with such a project, that there was a very real risk of the umbrella scaffolding being blown away by the formidable westerly wind, and that we would need to make much greater investments to anchor it firmly enough to the ground.
But we may have found an alternative solution! We might still keep our feet dry in November. So watch this space. At least our scaffolding will have allowed us to gain a bit of height, and see Miramon from the perspective of the red kites (or thereabouts)...